Stainless steel track fishplate for elevator
Description
● Length: 260 mm
● Width: 70 mm
● Thickness: 11 mm
● Front hole distance: 42 mm
● Side hole distance: 50-80 mm
● Dimensions can be adjusted according to the drawing
Kit
●TK5A Rails
●T75 Rails
●T89 Rails
●8-Hole Fishplate
●Bolts
●Nuts
●Flat Washers
Applied Brands
● Otis
● Schindler
● Kone
● Thyssenkrupp
● Mitsubishi Electric
● Hitachi
● Fujitec
● Hyundai Elevator
● Toshiba Elevator
● Orona
● Xizi Otis
● HuaSheng Fujitec
● SJEC
● Jiangnan Jiajie
● Cibes Lift
● Express Lift
● Kleemann Elevators
● Giromill Elevator
● Sigma
● Kinetek Elevator Group
Production process
● Product Type: Connector
● Process: Laser Cutting
● Material: Carbon Steel,Stainless Steel, Alloy Steel
● Surface Treatment: Spraying, Anodizing
Quality Management
Vickers Hardness Instrument
Profile Measuring Instrument
Spectrograph Instrument
Three Coordinate Instrument
Our Services
Efficient production management system
Optimize production process: Use advanced production management software to continuously optimize production process, improve production efficiency and reduce production cost.
Lean production concept: Introduce lean production concept, eliminate waste in production process, improve production flexibility and response speed. Achieve on-time production and ensure on-time delivery of products.
Teamwork spirit: Emphasize teamwork spirit, close cooperation between departments, and timely solve problems arising in production process.
Sustainable development concept
Energy saving and emission reduction: Actively respond to the national call for energy saving and emission reduction, and adopt energy-saving and environmentally friendly processing equipment and processes. Reduce energy consumption and pollutant emissions to achieve sustainable development.
Resource recovery: Recycle waste generated in the production process, reduce resource waste, and contribute to environmental protection.
Social responsibility: Pay attention to corporate social responsibility, actively participate in public welfare and social donations, establish a good corporate image, and win the respect and trust of the society.
Packaging and Delivery
Angle Steel Bracket
Right-angle Steel Bracket
Guide Rail Connecting Plate
Elevator Installation Accessories
L-shaped Bracket
Square Connecting Plate
FAQ
1. How can I get a quote?
Our prices vary according to process, materials and other market factors.
After you provide drawings or samples, we will send you the most competitive quote.
2. How much of an order do you need to place?
For small products, we require a minimum order quantity of 100 pieces, while for large products, it is 10 pieces.
3.What payment methods does your company accept?
We accept payment via bank account, Western Union, PayPal, or TT.
4. How long does it take to ship after placing an order?
(1)Samples are shipped 7 days after size confirmation.
(2)Mass-produced products are shipped 35-40 days after payment is received.
5.What are the modes of transportation?
The modes of transportation include sea, air, land, rail, and express, depending on the quantity of your goods.